PMC Digital Platform
PMC Digital Platform
Intelligent Building · Sustainable Future

Sign In

Enter your credentials to access the Envision360 PMC system. Contact your project manager if you need access.

Villa PMC
MA
Good morning, Mohammed
Villa Project
MEP Works
Intelligent Building · Sustainable Future
12
Inspections
4
Open Snags
8
Requests
Site Forms
8
📦
Material Request
Request materials before work starts
12
🔍
MEP Inspection
Pre-plaster, final & testing stages
4
🔧
Snag Report
Raise and track defects on site
⏱️
Daily Timesheet
Log attendance and daily work
📊
Progress Report
Weekly % complete per zone
Testing & Commissioning
MEP system sign-off
Quick Access
Material Request
Villa PMC · MEP Works
MR-009
Date *
Request ID
Work Package *
Location / Zone *
Material Items *
Description Qty Unit
Priority *
Reason / Justification
Drawing Reference
Attachment / Photo
📷
Tap to add photos or attach document
JPG, PNG, PDF supported
Submitted By *
Signature *
PMC Approval Status
MEP Inspection
Villa PMC · Site Inspection
INS-014
⚠️ Pre-Plaster Clearance requires PMC approval before walls are closed. Ensure all photos are attached before submitting.
Date *
Time
Work Package *
Inspection Stage *
Zone / Location *
Activity Description *
AI
AI Inspection Assistant
Analysing with Claude AI...
Inspection Result *
Photos *
📷
Minimum 1 photo required
Take photo or upload from gallery
Non-Conformance Details
Corrective Action Required
Target Completion Date
GPS Location
📍
Tap to capture site location
Contractor Signature *
PMC Approval Signature
Approval Status
Snag Report
Villa PMC · Defect Tracking
SNF-021
Date *
Snag ID
Work Package *
Zone / Location *
AI
AI Defect Analysis
Claude AI is analysing the defect...
Snag Description *
Snag Category *
Priority *
Photos — Min 2 Required *
📷
Photograph the defect clearly
Multiple angles recommended
Drawing Reference
Rectification Required *
Target Date *
Snag Status
GPS Location
📍
Tap to capture defect location
Raised By *
Signature *
Progress Report
Villa PMC · Weekly Progress
PR-006
Week Ending *
Report ID
Work Package *
Zone *
% Complete This Week *
45%
Planned % This Week
Activity Description *
Any Blockers?
Blocker Details
Next Week Plan
Photos
📷
Add progress photos
Submitted By *
Signature *
Testing & Commissioning
Villa PMC · System Sign-Off
TC-003
Date *
Test ID
Work Package *
Test Type *
Zone / Location *
Test Description
Equipment Used
Test Parameters & Results *
Test Result *
Test Photos / Certificates *
📄
Attach test photos and certificates
Remarks
Contractor Signature *
PMC Witnessed By *
Status
Daily Timesheet
Villa PMC · Attendance Log
TS-018
Date *
Weather
Work Package
Manpower Log *
Name Trade Time In Time Out
Work Summary *
Any Issues / Delays?
Site Photos
📷
Add daily site photos
Supervisor Signature *
Recent Activity
All submissions
MEP Inspection — INS-013
Pre-Plaster · Master Bathroom · 2A Electrical · Pass ✓
2h ago
Material Request — MR-008
PEX Pipe 25mm × 200m · Water Supply · Pending
5h ago
Snag Report — SNF-020
Pipe fitting leak · Kitchen · Critical · Open
Yesterday
Daily Timesheet — TS-017
6 workers · 8 hrs · HVAC Installation
Yesterday
Inspection — INS-012
Final Fixture · Living Room · Electrical · Pass ✓
2 days ago
Project Drawings
IFC Set + Shop Drawings
📐 Drawings are stored securely in Google Drive. Tap any drawing to view. Requires internet connection.
IFC Set — Issued for Construction
📄
A-101 — Ground Floor Plan
Architectural · Rev 3 · Updated 26/05/2026
IFC
📄
E-201 — Electrical Layout GF
Electrical · Rev 2 · Updated 22/05/2026
IFC
📄
P-301 — Plumbing Layout GF
Water Supply · Rev 2 · Updated 22/05/2026
IFC
📄
H-401 — HVAC Layout GF
HVAC · Rev 1 · Updated 20/05/2026
IFC
Shop Drawings
📄
SD-E-101 — MDB Single Line
Electrical Shop · Rev 1
SHOP
📄
SD-P-201 — Water Supply Isometric
Plumbing Shop · Rev 2
SHOP